Big picture: how onboarding works
Switching to Pilot from another LMS means moving your case volume from one pipeline to another. The cutover date is the gate between them: from that day on, new cases go into Pilot instead of your old system. Until then, you set Pilot up alongside your old system, and nothing changes for your doctors.
Before cutover
New cases still go into your old system. You set up Pilot and load your data next to it.
Cutover date
You stop entering new cases in your old system. Every new case goes into Pilot.
After cutover
Pilot takes all new cases. Your old system only holds what was already in it.
Cases still open on cutover day
- Bring them over as they are
- Import the open cases with their current status and finish them in Pilot. Reprint their work tickets from Pilot, so the paperwork on the bench matches. → Import historical cases
- Finish them in your old system
- Ship and invoice them where they started. Once they’re closed, bring them into Pilot with a second, smaller migration.
Start at the beginning of a billing cycle
Your old system’s last statement and Pilot’s first one then split cleanly, and balances carry over without overlap. → Import historical financial data
You're done when: You’ve picked a cutover date, and decided what happens to the cases still open that day.
