Build your production flow
Work Tracking turns every live case into production steps, puts them at the right workstations in the right order, and hands them to technicians. You describe three things once: where work happens, what the steps are, and who does them. Set them up in that order, since each one builds on the last.
Before you start
- Your workstations or benches, and the order work moves through them.
- The steps your products go through, and roughly how long each takes.
- Your technicians and their working hours.
The Schedule Builder
Your whole flow on one canvas: workstations in order, the steps at each, and the technicians with their capacity. Drag steps and people onto workstations, preview how a product would be scheduled, and see which workstation will slow you down.
You're done when: Your flow is mapped end to end, with steps and technicians at every workstation.
Workstations
A workstation is a place in your lab where steps happen, like Design, Milling or Finishing. Each one has a sequence: its place in your flow. Workstations with the same sequence run side by side.
What to set up
- 1A workstation for each stage, linked to the one a case goes to next.
- 2How work gets assigned at each one. Automatic gives each step to the technician who can start it earliest. With Push, Pull or Custom, steps wait unassigned until a manager hands them out or technicians take them.
- 3Departments and lab locations, if you want them. Departments group workstations in reports, and a location tells you where every case is.
Production tasks
A production task is one step in making a product, like “Mill crown”. Every step belongs to a workstation, and runs in that workstation’s order.
What to set up
- 1The steps at each workstation, in order, with how long each takes: the hands-on time, and the total turnaround including waiting.
- 2Merge, for a step that’s done once for several products on the same case.
- 3Scale with quantity, for per-unit work that takes longer the more units there are.
- 4Machine time, for long machine steps like sintering that shouldn’t use up a technician’s time.
Technicians
Technicians are the people at your workstations. Their shifts decide how much work each one can take on.
What to set up
- 1Technicians at each workstation they work at.
- 2Weekly shifts for each person, and a capacity multiplier for anyone faster or slower than the standard step time.
- 3A capacity check: how many of each step a technician can do in a day or a week, and which workstation is your bottleneck.
Automatic workstations need people
A workstation that assigns automatically needs at least one technician with shifts. Without one, cases with steps there can’t be scheduled.